In August 2024, HOSTON reached a cooperation agreement with a Japanese client and completed R&D and production in October, along with supporting photovoltaic and tidal power generation. After the products arrived in Japan, we arranged for a technical team of software and hardware engineers to travel to Japan to guide installation and commissioning, and ultimately the energy storage system operated smoothly.